The area above the sliding door was always going to be a difficult area to finish nicely. It goes in all different directions. What was needed was a something bendy to take up the shape but solid.
MDF of course. Bendy when wet, solid when dry.
So how to wet it? Well 2 hours in the hot tub at 40C did the trick.
Once its fully dried out and set it will be covered with the wall lining.
Other bits done today. The front of the ambulance had a very wasteful 45 degree panel each side which had to go.
It can bee seen here
This also went most of the way to the ceiling and so was in the way of the top cupboards, and also it was going all over the place with angles and would have been difficult to cover with wall covering.
Much neater and easier to cover now
I am finally beginning to see the light at the end of the tunnel.
No comments:
Post a Comment