I fitted my Caravanstore today. From start to finish took about 3/4 of an hour.
Start
Masking tape used to set the line, then taped in place
to drill pilot holes
to drill pilot holes
A dab of sealant behind the screws
Track fitted
Carvanstore loaded into the rail
2 minutes to erect
Other jobs done today were lots of little things. The principle one being the waste plumbing.
I have also secured the water tanks, done some final trimming in aluminum angle of the garage doors and other areas in the garage, finally screwed in the upper rear marker lights, trimmed the mattress to shape, and adjusted the handbrake, although I think a new cable might be needed. I have also ordered my Walnut dash kit.