I have been busy with steps.

The first step was to remove the old rear step that was for the back doors.  This is where I want to put the water tanks. The recess the step provides is ideal to enable me to put the tanks under where the fixed bed will be.

The old GRP step fascia was removed to reveal the nice strong steel supports underneath.  The floor then needed to be cut away to the size of the tank.


GRP removed and floor cut out

The whole then needed to be filled to make up the new lower floor and seal up the rest of the whole.


18mm shuttering ply glued and screwed


All fitted with screws through the steel supports
and through the floor.


160l water capacity.

The tanks I am using were industrial food containers each 80l.  I will be plumbing these up in due course.  These 2 water tanks cost me £22 delivered!

The next step was to create a step.

I think when the ambulance was commissioned there was never any intention of using the side door as it was obstructed by a rack, also there was no step.  I needed to put a step in here for 3 reasons.  1 is headroom through the door. 2 my knees aren't getting any younger. 3 now only need a single step up so less to carry.



Carefully considered and marked out.
(Measure twice, cut once!)


All cut out




Nice new step