Monday 7 June 2010

Cupboards Doors And Draws

Now I'm back from our week away. Today I started to fit out the interior.

This is a heavily modified B&Q 600mm draw unit.  Most of this is under the bed.  I have put in the bearers for the bed but not the slats yet as I need to get access.

Next was the shower room door.  


Then time for the over-cab doors and side cupboards.


On Sunday I fitted the new radio I got for it.  I'm very impressed.  It links to my iPhone a treat for calls and iPod playing, has loads of other features too.  All for about £50.  It even has a load of wires for a sub to connect to so I suppose I will have to get one now.